Spring Opening for Salt Chlorinated Pools
Perform a complete water analysis and balance. Perform a salt test to determine how much salt is needed to start up. Salt is only lost through backwashing, splashout and other methods of physical water loss.
Backwash and clean filter with Filter Brite.
Add 1 bag of Salt Pool Sparkle per 50,000 litres to establish an initial free chlorine residual of 1.5 - 3.0 ppm.
As an algae preventative, an initial dose of 100 mL of Polygard per 10,000 litres should be applied, followed by 35 mL per 10,000 litres on a weekly basis
Turn the salt chlorinator controller to the AUTO position to begin generating sanitiser. Adjust the output to the desired setting.
Begin regular maintenance the following week.
Posted By Red Baron on Friday 29th January 2010 @ 14:10:20
Updated : Wednesday 22nd February 2012 @ 10:15:05 | Words : 125 | Views : 172 | Comments : 0
Blog Categories
Bioguard Pool Product Information
Pool and Spa Industry Fact Sheets
Pool Opening and Closing
Pool Operation and Maintenance
Pool Troubleshooting
Pool Water Balance
Spa Operation and Maintenance
Spa Product Information
Spa Troubleshooting
Spa Water Balance
Ozonators
Ozonators Ozone is often used in spas and pools to help reduce contaminants. Used by itself, it is . . .
Posted By Red Baron on Friday 29th January 2010
Words : 329 | Views : 179 | Comments : 0
Ionisers
Ionisers Copper and Silver are sometimes used as sanitisers in swimming pools. In a process called . . .
Posted By Red Baron on Friday 29th January 2010
Words : 424 | Views : 435 | Comments : 0
Automatic Chlorine and Acid Dispensers
Automatic Chlorinators Chemigem D10 (DM52) WITH VALVES. Chlorine and pH controller suitable for mos . . .
Posted By Red Baron on Friday 29th January 2010
Words : 252 | Views : 201 | Comments : 0
Blogger : red-baron
. . .
Registered Since Tuesday 28th February 2012
Topics : 103 | Comments : 0